Home News INDUSTRY NEWS What Should Distributors and Project Buyers Check Before Ordering Custom Seating?

INDUSTRY NEWS

What Should Distributors and Project Buyers Check Before Ordering Custom Seating?

Lock the spec before the price: frame, seat height, foam, fabric, finish, carton, certification. Record the color reference for re-orders. ZEHAO OEM/ODM, MOQ 60, 15–20 days.

Build a one-page specification sheet

Write down the model, dimensions, seat height, frame material and finish, fabric reference, foam density, stack height and carton size. A single signed sheet prevents the most common source of dispute between a project buyer and a factory.

Certification belongs in the purchase order

List the test reports you need before production starts. ZEHAO can provide CE and EN 12520 documentation and SGS test reports. For public venues, check local fire and stability requirements with your authority before placing the order.

Think about spare parts and re-orders

Distributors should keep a small stock of replacement glides, fabric and frames for the models they sell most. Ask the factory which components are standard and which are made to order. Re-ordering the same finish six months later is easier when the color reference is recorded.

Packaging is part of the product

Retail and project channels need different cartons. Confirm whether you need plain master cartons, retail boxes or customized logo packaging, and check the carton dimensions against your warehouse and container plan.

Price the whole cycle, not the unit

Add re-order lead time, damage rate, certification cost and storage to the unit price. A 15–20 day production window from deposit gives project buyers a realistic buffer for installation schedules.

Next step. Send your specification sheet and channel requirements to ZEHAO for a distributor or project quotation.